Maple-systems OIT4175A Manual do Utilizador Página 11

  • Descarregar
  • Adicionar aos meus manuais
  • Imprimir
  • Página
    / 12
  • Índice
  • MARCADORES
  • Avaliado. / 5. Com base em avaliações de clientes
Vista de página 10
3. Route the communication cable to the PLC/host. Refer to the “OIT Cable
Routing” section for more information.
4. Connect the other end of the cable to the PLC/host and tighten the cable screws.
5. Connect the green shield wire from the cable to earth ground (chassis
ground) on the PLC. If this wire is not present, the ground connection was
made inside the connector.
1010-0103, REV 04
14 OIT3175A/4175A
PIN# FUNCTION
1 TXD+
2 TXD-
3 CTS
4 RETURN
5 TXD
6 RXD
7 RXD-
8 RXD+
Figure 6 Port 1 Pin Outs
3.4. Mount OIT to Panel
STEPS
1. Gently position the OIT with the studs through the panel mounting holes.
2. Secure the OIT by installing the four #6-32UNC mounting nuts using a
5/16 inch socket wrench or nut driver.
CAUTION: Do not torque the 4 mounting nuts to over 15 pound-inches. Ove
r
torquing can strip the threads or pull the studs loose.
RE-INSTALLING: Because the gasket will take a “set” to the panel, be sure to
re-install any OIT to the same panel cutout when a NEMA 4/12 seal is required.
1010-0103, REV 04
INSTALLATION MANUAL 11
Figure 3 OIT3175/4175 Panel Mounting
Vista de página 10
1 2 ... 6 7 8 9 10 11 12

Comentários a estes Manuais

Sem comentários